CAPTION
| PREVIOUS |
INDEX
| NEXT (or just click anywhere on image) |

This time we came prepared to cut, install, and seal a 2" Schedule 80 electrical conduit up from the new exterior circuit breaker panel to the attic through an eave. It involved a lot of details, but went smoothly.
F_NewConduitInstalled.jpg (106 Kb) (under photos/25/0921-23_CathiesCabin/)
By Alan Silverstein, ajs@frii.com (page updated Tue Mar 10 18:16:39 MDT 2026)